Anchoring
1. Mark the location of the holes for the bolts.
2. Make at least 1" larger than the diamete of the objects to be anchored. For large objects, such as metal pipes of fence posts, use a diamond-edge cold chisel and a small sledgehammer to make the hole. The hole must be at least 2" deep.
3. Brush all the dirt, dust, and other loose material from the hole. Dampen the interior of the hole.
4. Insert the object to be anchored and pour the prepared mix into the hole to the surface level. Anchoring Cement can also be packed in with a towel; when using this method, be sure to completely fill the hole.
5. Hold the object being anchored in place until the mix begins to stiffen. This will depend on the amount of water used to prepare the mix.
6. Wait about 45 minutes before fastening anything to the bolt or post to allow the mix to achieve a final set.
For Best Results
Use only clean water and containers to prepare the mix.
Apply a coat of QUIKRETEŽ Acrylic Concrete Cure & Seal to all outside projects or areas exposed to dampness or moisture after the mix obtains a final set.
Use QUIKRETEŽ Concrete And Asphalt Cleaner to make certain that any oil or other film that could prevent bonding has been cleaned from the hole.
Wall Mountings
QUIKRETEŽ Anchoring Cement's quick setup time and great strength make it the ideal choice for a wide range of vertical anchoring projects, including bolts, brackets, hooks, racks, shelves, pulleys, and awning and canopy mounts. For vertical installations, decrease the amount of water in the mix so it reaches a putty-like texture.
Required Tools & Materials |
- QUIKRETEŽ Anchoring Cement
- QUIKRETEŽ Acrylic Concrete Cure & Seal
- Small drill and hammer or ½" electric drill with masonry bit
- Small brush and trowel
Anchoring
1. Mark on the concrete the location of the hole(s) for the hook or mounting bolts.
2. Make a hole at least 2" deep and about 3 times the diameter of the bolt or hook to be inserted.
3. Brush all dirt, dust, or loose material out of the hole.
4. Dampen the interior of the hole; leave no standing water. Insert the hook or bolt and pack the prepared mix firmly around it to just above the surface level. Prepare only as much mix as can be applied in 10 minutes.
5. Hold the bolt or hook in place until the mix begins to stiffen. (It generally takes only a few minutes. Mix prepared with large amounts of water will take longer).
6. After all the bolts have set for about 45 minutes, attach any mounting brackets that your project requires. Except for the most unusually heavy objects, mounting can be done after a few hours.
For Best Results
- Use only clean water and containers to prepare the mix.
- For exterior use and areas exposed to dampness or moisture, apply a coat of QUIKRETEŽ Acrylic Concrete Cure & Seal after the concrete reaches its final set.
|