Project Profiles > Structural Concrete Repair and Resurfacing
J.W. Marriott Resort & Spa

An upscale Mediterranean-style hotel, JW Marriott Las Vegas Resort & Spa is a peaceful retreat located just minutes from action on the Las Vegas Strip or the serenity of Red Rock Canyon. Featuring a pool, spa, fitness center, beauty salon and a variety of both upscale and casual dining options, the JW Marriott Las Vegas Resort & Spa added a new parking garage to better accommodate its guests. In order to seamlessly connect the old parking garage and new parking garage with as little disruption as a possible, Gillette Construction built eight transition ramps made of QUIKRETE® Q-MAX Pro CONCRETE MIX. Designed to reach 1,000 PSI in three hours and 3,000 PSI in 24 hours, using QUIKRETE® Q-MAX Pro resulted in ramps that could be open to traffic quickly.

QUIKRETE® Q-MAX Pro is the first and only concrete mix that delivers one-hour working time, three-hour walk-on time and 6,500 PSI compressive strength with crack, freeze-thaw and corrosion resistance. Ideal for horizontal concrete applications such as slabs, parking garages, bridge decks, roads, balconies, steps, floors, ramps, sidewalks and patios, QUIKRETE® Q-MAX Pro is applied at a minimum thickness of 2” and meets ASTM C387/C387M specifications for packaged, dry, combined materials for concrete and high strength mortar.

QUIKRETE® Contact:
Email: projects@quikrete.com

Project Profile: J.W. Marriott Resort & Spa

Location:
Las Vegas, NV

Contractor: Gillette Construction

Product(s):